SMD Chip 5050 600W 300W 900W Marine LED Flood Lights
Lumen output 140-150lm/w IP66 Marine LED Flood lights LED 300W Free Maintenance
Easy Combination
1. 600W is assembled by 2pcs 300W,900W is assembled by 3pcs 300W,1200W is assembled by 4pcs 300W
2. You can stock plenty of single modules to assemble them into 2 modules, 3 modules and 4modules like LEGO by using different installation bracket and cable.
Characteristics
1. Connection installed | - To assemble 240W-1200W with 1-4 modules. Modules are packaged separately to reduce shipping costs. AC is connected with M15 waterproof quick connectors. One module can be quickly composed with only 4 screws.
|
2. Lightweight Design | - Less weight 50%. Weight of folding fin heat sink is lighter than die casting, extrution eto.
|
3. High heat dissipation | - Our Flood lights have a very good cooling system using a combination of highly thermally conductive materials. In fact, if the heat around the LED chip is too high, the brightness and life of the lamp will be reduced. Therefore, we also attach great importance to heat dissipation during design, which is one of the reasons for the durability of our lamps.
|
4. Rotatable Module | - 1. Rotating scale on the luminaire for customers to adjust the angle more accurately.
- 2. Module rotatable up & down & back and front up to 360 degree.
|
Maintenance
- Coupler bracket for wall, ceiling, surface, side-mount or post-top
- Adjustable bracket (between -125° and 125° from horizontal)
- Recommended mounting height: 8-200m (from 200W to 1000W)
- Tool-less driver maintenance
- Storage temperature up to 85ºC.
- Operating temperature from -30ºC to +50ºC
Common Applications:
- Container loading areas and general shipping yards and marine searching lighting and bow lighting.
- Sports and stadium lighting and prison or army security lighting.
- Car park,Shopping centres,Pedestrian crossings,Industrial & logistical.
- General flood and area lighting.
Trade process
- Trade term: EXW, FOB, CIF
- MOQ: 1pcs
- Port: Shenzhen
- Sample availability: Yes
- Supply capability: 1000 pcs/week
- Payment: T/T, Western Union, L/C, Paypal.
- Shipment: ocean or air transportation, international express
- Normal lead time: 3-5days for sample order;15-20 days for production order
- Payment condition: 30% before production, 70%before delivery
- Packing: Netural carton box/ Customized packing are acceptable


Dimension Information |  |
Packaging list |  |